Miami Special Utility Authority
Special DistrictOK
Posted
Jun 30, 2026
Sep 3, 2026
Waste Transfer Building Repairs and New Loading Dock
Project consists of construction of a new concrete loading dock on the south side of the existing MSUA waste transfer building and repairs to the south and north walls of the existing facility, including new wall construction and roof extension with steel purlins and girders immediately adjacent to and above the proposed loading dock and misc. Wall repairs to the north wall of the existing waste transfer building.