Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovate loading dock & building entrance - electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will renovate the loading dock.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Project will renovate the loading dock.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform loading dock repairs at its facility.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Perform loading dock repairs at its facility.
AvailableProvide overhead door and loading dock maintenance and repair services for the airport.
Posted Date
Jan 5, 2026
Due Date
Feb 6, 2026
Release: Jan 5, 2026
Close: Feb 6, 2026
Provide overhead door and loading dock maintenance and repair services for the airport.
AvailableThe scope of work includes rehabilitating the brick face and coping stones of the ramp walls, applying new waterproofing above the underpass structure, rehabilitating regions of deterioration concrete structural slab and concrete encased steel beams of the underpass, replacing existing drainage inlets, and piping at the loading dock and above the underpass at the south plaza/walkway, upgrading/replacing existing lighting elements/fixtures in loading dock ramp walls and above at south plaza/walkway, milling existing concrete pavement of loading dock ramps and perform repairs and seal pavement of the entire loading dock region and ramps, replacing existing bluestone pavers walkways and concrete pavements lobby areas with new stamped/imprinted concrete pavement, landscaping at the south plaza/walkway, painting existing fire sprinkler piping.
Posted Date
Dec 31, 2025
Due Date
Feb 3, 2026
Release: Dec 31, 2025
Close: Feb 3, 2026
The scope of work includes rehabilitating the brick face and coping stones of the ramp walls, applying new waterproofing above the underpass structure, rehabilitating regions of deterioration concrete structural slab and concrete encased steel beams of the underpass, replacing existing drainage inlets, and piping at the loading dock and above the underpass at the south plaza/walkway, upgrading/replacing existing lighting elements/fixtures in loading dock ramp walls and above at south plaza/walkway, milling existing concrete pavement of loading dock ramps and perform repairs and seal pavement of the entire loading dock region and ramps, replacing existing bluestone pavers walkways and concrete pavements lobby areas with new stamped/imprinted concrete pavement, landscaping at the south plaza/walkway, painting existing fire sprinkler piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →