CityPA
Posted
Aug 10, 2026
Sep 23, 2026
Description: Work includes installation of approx 586 LF of 8" dia sdr-35 polyvinyl chloride (pvc) sanitary sewer main, 6,877 LF of 30" diameter sdr-26 polyvinyl chloride (pvc) sanitary sewer main; installation of 23 72" diameter concrete manholes including 184 LF additional manhole vertical depth beyond 6-ft; installation of 343 VF of cured-in-place manhole liner; trench safety system; connection to an active manhole; remove and replace 108 LF of roundabout curb and gutter; remove and replace 470 SF of roundabout sidewalk; remove and replace 305 SF of concrete driveway; restoration of 14,021 SY of unpaved road; scarify and compact 3,954 SY of 8" subgrade material under paved road. See outside link.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from El Paso Water.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Aug 10, 2026
Sep 23, 2026
Work includes construction of approx 22,000 LF of 8" gravity sewer pipe, 4,200 LF of 4" force main sewer pipe, 2,500 LF of 2" force main sewer pipe, 1,300 LF of 2" low pressure sewer pipe, 2,500 LF of 6" gravity sewer laterals, 135 lateral viewports, 120 manholes, 7 grinder pumps, 2 pump stations, including municipal & state roadway restoration, appurtenances and all related work.
West Valley Sanitation District (Santa Clara County)
Special DistrictCA
Posted
Aug 21, 2026
Sep 22, 2026
Work includes approx 4 EA new sanitary sewer manhole; 434 LF of 8" PVC DR26 open cut sanitary sewer; 1 LS abandon existing sanitary sewer laterals; 5 EA perform pot holing.
CityKS
Posted
Aug 29, 2026
Oct 8, 2026
Furnishing of all materials, tools, equipment, labor, appurtenances and other services necessary for the installation of 510 LF of 8" sdr35 sewer collection main, 3 service wyes, 350 LF of 4" pvc sewer lateral, 3 precast manholes, one complete lift station including electrical service, 480 LF of 1-1/2" HDPE sdr 11 force main, connections, and subsidiary items of work, for the complete project.
Special DistrictIL
Posted
Aug 18, 2026
Sep 17, 2026
Work includes approx. of 850 LF of install fully structural 12" CIPP liner; 5 EA of reinstall service laterals; 1 LS of provide pre and post video inspection; 1 LS of sewer flow control.