Marilynn Ave. Bridge Removal & Replacement
The project consists of the removal and replacement of bridge. 1,041 CY excavation; 278 SY aggregate base; 480 SY sodding.
Description: Work includes approx 225 CY earth excavation: 2,417 SY erosion control blanket: 2,417 SY temporary erosion control blanket: 1,320 SY hot-mix asphalt surface removal, 3 3/4": 1,885 LF temporary pavement marking - line 4" - type iv tape.
StateAgency · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMO
Posted
Sep 22, 2026
Oct 15, 2026
The project consists of the removal and replacement of bridge. 1,041 CY excavation; 278 SY aggregate base; 480 SY sodding.
Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
4,633 CY earth excavation; 958' grading and shaping ditches; 612 SY erosion control blanket; 120 Ton polymerized hot mix asphalt surface course, IL-9.5, mix D, N70; 955 CY concrete superstructure; 14 cal da changeable message sign; 494' short term pav marking. See outside link.
CountyMO
Posted
Sep 17, 2026
Oct 14, 2026
Provide Bridge Materials, Culverts & Pipes.
CityMO
Posted
Sep 29, 2026
Oct 20, 2026
The City of Columbia is seeking bids to replace the existing Bridge 9 on the MKT Trail, including the labor, materials, and equipment specified for the work. Preliminary plans describe a 105-foot, single-span prefabricated bridge designed to accommodate heavier maintenance and emergency vehicles. Construction was expected to begin in late November 2026 and finish near the end of March 2027, weather permitting.