CityWI
Posted
Oct 30, 2026
Dec 10, 2026
Well 5 Water Treatment Facility RFP
Construction of the Well 5 water treatment facility, including well and booster pumps, treatment equipment, piping, controls, plumbing, electrical, and HVAC work.
Description: This project includes renovations to an existing on site building to allow movement of water treatment system equipment from existing on-site building to the renovated building. Installation of new underground raw water piping from the existing well to the renovated building as well as new chlorine contact piping and interconnection to the Burnside Borough's water system. Plumbing and process piping work in the renovated building. Includes disconnecting, moving and installing items from the existing onsite building to the renovated building. Includes new electrical service entrance, conduit and wiring, renovated building power and lighting. Conduit and wiring from emergency generator to the renovated building and into the relocated Automatic Transfer Switch. Includes use of Owner's designated contractor for the relocation, installation and start-up of the existing proprietary alarm and communication system components.
City · PA, US
Adjacent opportunities open for bidding right now.
CityWI
Posted
Oct 30, 2026
Dec 10, 2026
Construction of the Well 5 water treatment facility, including well and booster pumps, treatment equipment, piping, controls, plumbing, electrical, and HVAC work.
CityAZ
Posted
Nov 8, 2026
Dec 14, 2026
The Town of Prescott Valley, Arizona, operates a network of drinking water wells. One of the Town's wells, Quailwood No. 3 well, has historically contained elevated levels of per- and polyfluoroalkyl substances (PFAS). This Project consists of installation of a PFAS Treatment System to remove PFAS from extracted groundwater at the Quailwood No. 3 well. The Contractor shall furnish all necessary materials, labor, equipment and incidentals to construct the PFAS treatment system as outlined in this Bid document.
Emerald Coast Utilities Authority
Special DistrictFL
Posted
Nov 5, 2026
Dec 10, 2026
Work includes Demolition of existing water treatment building (existing well to remain); Construction of new water treatment building; Site work including clearing, grubbing earthwork, grading, site piping, paving, gravel, fencing, landscaping, and stormwater attenuation measures; Site Electrical Work.
Special DistrictCA
Posted
-
Nov 24, 2026
Engineering services to validate, permit, and design PFAS wellhead treatment systems at four wells: Agua Caliente, Craig, Pedroncelli, and Larbre.
Solicitation files and supporting documents for this bid.