PFAS Treatment System Design RFP
Engineering services to validate, permit, and design PFAS wellhead treatment systems at four wells: Agua Caliente, Craig, Pedroncelli, and Larbre.
Description: The Town of Prescott Valley, Arizona, operates a network of drinking water wells. One of the Town's wells, Quailwood No. 3 well, has historically contained elevated levels of per- and polyfluoroalkyl substances (PFAS). This Project consists of installation of a PFAS Treatment System to remove PFAS from extracted groundwater at the Quailwood No. 3 well. The Contractor shall furnish all necessary materials, labor, equipment and incidentals to construct the PFAS treatment system as outlined in this Bid document.
City · AZ, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
206 days before RFP
The Town completed Quailwood 3 PFAS pilot testing and was preparing bid documents and advance equipment procurement, subject to EPA and WIFA review.
talk touching a little bit on PAS. So we have um completed our study and I just wanted to share a lovely picture of that uh pilot study and uh essentially we compared how several different ion exchange resins actually perform when given our the water chemistry at Quailwood 3 just to make sure that we opt for the best technology to actually be able to…
Town Council Special Study Session
Board meeting · Apr 16, 2026
Board meeting
136 days before RFP
The Town Council approved Amendment No. 1 extending Jacobs's Quailwood Well #3 design contract, while Utilities anticipated advertising construction within two to three months.
see. This item is for the professional services agreement related to the design work that Jacobs is doing for us at the Quailwood Well, number three. And it's a PAS treatment design that's going to be um installed at that well. Uh and just just so you know and the audience knows um this is not Jacob's the operating arm that's here tonight that we just…
Capital improvement plan
132 days before RFP
The CIP proposed study, pilot testing, design, and construction of a PFAS treatment system at Quailwood Well #3, with pilot testing and final design still incomplete.
Project Scope Study, pilot testing, design and construction of a PFAS treatment system to be located at the Quailwood #3 well site. The project is currently in design, and the estimated cost for the treatment system is about $3.5 million. Project Risks, Assumptions and Constraints Pilot testing and final designs are not yet completed. Final costs have not…
Prescott Valley Capital Improvement Plan 2027-2036
Capital improvement plan · Jun 29, 2026
Board meeting
17 days before RFP
The Town Council approved Jacobs Engineering Group's $1,022,061 construction-phase services agreement for the Quailwood Well #3 PFAS Treatment Project, with vessel bids due in mid-November and construction bids anticipated in mid-December.
b. Quailwood Well #3 PFAS Treatment, Construction Phase Contract - Consideration & Possible Action (Approve) \[James Warne, Senior Utilities Engineer\] James Warne, Senior Utilities Engineer, requested approval of an engineering services agreement with Jacobs Engineering Group for construction-phase services for the Quailwood Well 3 PFAS Treatment Project.…
RFP published
Proposals due (22 days left)
Town Council Regular Meeting
Board meeting · Jun 25, 2026
Design is approximately 80% complete, with pre-purchase of pressure vessels planned before bidding. Construction is anticipated to be advertised within the next two to three months.
Prescott Valley Town Council Regular Town Council Meeting Agenda
Agenda packet · Aug 13, 2026
FY 2026-27 Objectives High-Performing Team: Improve the operation of the Prescott Valley North Plains Recharge Facility Complete the Town's Water Conservation Strategic Plan Complete a Wastewater Treatment Plant Master Plan to address current and future needs of the facility Complete the design of the Ranger Road Sewer Main Upsizing Project Water and Land…
Town of Prescott Valley FY2026-27 Budget
Budget · Jul 1, 2026
Town of Presca Valley Town Council Regular Meeting
Board meeting · Oct 22, 2026
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
-
Nov 24, 2026
Engineering services to validate, permit, and design PFAS wellhead treatment systems at four wells: Agua Caliente, Craig, Pedroncelli, and Larbre.
Special DistrictNY
Posted
Nov 17, 2026
Jan 5, 2027
Consists of the delivery & setting of the pre- purchased granular activated carbon adsorption systems from contract 5898-1a. The work also includes the installation of the GAC system concrete pad, installation of new temporary fencing around the GAC system concrete pad, and grading of the site.
CityPA
Posted
Nov 17, 2026
Feb 1, 2027
This project includes renovations to an existing on site building to allow movement of water treatment system equipment from existing on-site building to the renovated building. Installation of new underground raw water piping from the existing well to the renovated building as well as new chlorine contact piping and interconnection to the Burnside Borough's water system. Plumbing and process piping work in the renovated building. Includes disconnecting, moving and installing items from the existing onsite building to the renovated building. Includes new electrical service entrance, conduit and wiring, renovated building power and lighting. Conduit and wiring from emergency generator to the renovated building and into the relocated Automatic Transfer Switch. Includes use of Owner's designated contractor for the relocation, installation and start-up of the existing proprietary alarm and communication system components.
CityMA
Posted
Nov 5, 2026
Dec 4, 2026
PFAS Water Treatment Plant Upgrades: The project consists of modifications to the existing Pond Street, Beal, and Broadway Water Treatment Plants in Hanover, MA, including pre-fabricated metal building systems; PFAS treatment systems; chemical feed system; PFAS influent wet well; and associated structural, architectural, process piping, instrumentation and controls, plumbing, fire protection, HVAC, and electrical work to provide fully functional modifications to the water treatment plants. PFAS Water Treatment Plant Upgrades. https://projectdoc.com/Dashboard/ProjectDetail?projectId=262761