Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rejuvenating surface treatment in various townships.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project work consists of surface treatment.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Project work consists of surface treatment.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 56,920 SY high friction surface treatment; 2,178 SY micromilling; 42,527 LF temporary pavement marking - paint 6"; 1,440 hr flagger.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Work includes 56,920 SY high friction surface treatment; 2,178 SY micromilling; 42,527 LF temporary pavement marking - paint 6"; 1,440 hr flagger.
AvailableConstruction of a fiber reinforced bituminous membrane surface treatment known as "fibermat-type a" as a stress absorbing membrane, (SAM) and as "fibermat-type B" when used as a stress absorbing membrane interlayer, (SAMI).
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Construction of a fiber reinforced bituminous membrane surface treatment known as "fibermat-type a" as a stress absorbing membrane, (SAM) and as "fibermat-type B" when used as a stress absorbing membrane interlayer, (SAMI).
AvailableWork includes 1,364 SF construction signs; 4 unit portable variable message sign; 2,305 LF traffic stripes, latex, 4"; 95 LF traffic markings lines, latex, 24"; 55 sf traffic markings symbols, latex; 55 sf traffic markings, symbols, long-life, thermoplastic; 48 CY excavation test pit; 928 SY dense-graded aggregate base course, 6" thick; 3,819 Y hma milling, 3" or less; 2,730 LF polymerized joint adhesive; 309 gal tack coat; 414 ton hot mix asphalt 12.5m64 surface course, 2" thick; 345 ton hot mix asphalt 19m64 base course, 6" thick; 32 LF 24" reinforced concrete pipe. See outside link.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Work includes 1,364 SF construction signs; 4 unit portable variable message sign; 2,305 LF traffic stripes, latex, 4"; 95 LF traffic markings lines, latex, 24"; 55 sf traffic markings symbols, latex; 55 sf traffic markings, symbols, long-life, thermoplastic; 48 CY excavation test pit; 928 SY dense-graded aggregate base course, 6" thick; 3,819 Y hma milling, 3" or less; 2,730 LF polymerized joint adhesive; 309 gal tack coat; 414 ton hot mix asphalt 12.5m64 surface course, 2" thick; 345 ton hot mix asphalt 19m64 base course, 6" thick; 32 LF 24" reinforced concrete pipe. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →