Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1,364 SF construction signs; 4 unit portable variable message sign; 2,305 LF traffic stripes, latex, 4"; 95 LF traffic markings lines, latex, 24"; 55 sf traffic markings symbols, latex; 55 sf traffic markings, symbols, long-life, thermoplastic; 48 CY excavation test pit; 928 SY dense-graded aggregate base course, 6" thick; 3,819 Y hma milling, 3" or less; 2,730 LF polymerized joint adhesive; 309 gal tack coat; 414 ton hot mix asphalt 12.5m64 surface course, 2" thick; 345 ton hot mix asphalt 19m64 base course, 6" thick; 32 LF 24" reinforced concrete pipe. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for design and construction services for stormwater management and water quality improvements at Camp Mardela, including design/installation of upland and shoreline BMPs. Includes a mandatory pre-bid meeting and requires physical (non-electronic) bid submission.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Procurement for design and construction services for stormwater management and water quality improvements at Camp Mardela, including design/installation of upland and shoreline BMPs. Includes a mandatory pre-bid meeting and requires physical (non-electronic) bid submission.
AvailableWork include Installation of stormwater management improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work include Installation of stormwater management improvements.
AvailableProposed work includes: Stormwater Improvements in the City of Bevier Generally bound by Hunt St. on the north, Elvira St. on the south, Macon St. on the west and Bloomington St. on the east. The improvements include a 678 SY parking area, about 2,009 LF of Storm Drainage Pipe, 28 Drop inlet structures, various drainage structure adjustments, 193 SY pavement replacement, aggregate and sidewalk replacement as a result of storm drainage placement, and rock lining placement. The Work will be substantially complete on or before May 1, 2026, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 15, 2026.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
Proposed work includes: Stormwater Improvements in the City of Bevier Generally bound by Hunt St. on the north, Elvira St. on the south, Macon St. on the west and Bloomington St. on the east. The improvements include a 678 SY parking area, about 2,009 LF of Storm Drainage Pipe, 28 Drop inlet structures, various drainage structure adjustments, 193 SY pavement replacement, aggregate and sidewalk replacement as a result of storm drainage placement, and rock lining placement. The Work will be substantially complete on or before May 1, 2026, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 15, 2026.
Construction of green stormwater infrastructure (GSI) improvements on the Hinesburg Community School Campus.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Construction of green stormwater infrastructure (GSI) improvements on the Hinesburg Community School Campus.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis