Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sanford
Approx 1. 51 miles of full-depth reclamation of the roadway. Full Depth Reclamation of the existing roadway. Laying 12" of Portland cement treated ‘CABC’ base. Installing an intermediate course of 4 inches of Type I-19.0C asphalt, Applying 2 inches of S-9.5C asphalt concrete as the surface.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Red Bluff
The City of Red Bluff is soliciting proposals for the Red Bluff River Park Rehabilitation Project, which includes parking lot renovation, a new spray ground, a bandshell steel shade structure, athletic equipment, a pickleball court, and a restroom. A mandatory pre-bid meeting is scheduled and solicitation documents are available from the original posting on PublicPurchase.
Posted Date
Nov 7, 2025
Due Date
Dec 18, 2025
Release: Nov 7, 2025
City of Red Bluff
Close: Dec 18, 2025
The City of Red Bluff is soliciting proposals for the Red Bluff River Park Rehabilitation Project, which includes parking lot renovation, a new spray ground, a bandshell steel shade structure, athletic equipment, a pickleball court, and a restroom. A mandatory pre-bid meeting is scheduled and solicitation documents are available from the original posting on PublicPurchase.
AvailableCity of Huntsville
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
City of Huntsville
Close: Dec 17, 2025
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
AvailableCity of Westlake Village
The City of Westlake Village is soliciting bids to rehabilitate Berniece Bennett Park by removing existing playground equipment and surface and installing city-furnished equipment with a new rubberized play surface. Work includes mobilization, demolition/disposal, installation, and compliance with prevailing wage and bonding requirements.
Posted Date
Nov 6, 2025
Due Date
Dec 6, 2025
Release: Nov 6, 2025
City of Westlake Village
Close: Dec 6, 2025
The City of Westlake Village is soliciting bids to rehabilitate Berniece Bennett Park by removing existing playground equipment and surface and installing city-furnished equipment with a new rubberized play surface. Work includes mobilization, demolition/disposal, installation, and compliance with prevailing wage and bonding requirements.
AvailablePurdue University Main Campus
Work include drive rehabilitation.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Purdue University Main Campus
Close: Dec 18, 2025
Work include drive rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis