CityIN
Posted
Aug 28, 2026
Sep 28, 2026
Williamsburg Pond Expansion and Outlet
Work include expansion of the east side of the existing williamsburg pond, along with installation of a new 24" stormwater outlet pipe system. The outlet system will be located on the north side of the pond and will extend east and north to connect to an existing 24" diameter stormwater pipe along the drive south of sammlung platz. The work also includes sediment and erosion control measures and seeding for site stabilization.