Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of construction of a new single story 6,600 SF water treatment facility, including office and laboratory testing area. Structure consists of precast concrete T roof supported by insulated precast wall panels on cast-in-place concrete foundation. Interior partitions of CMU and GWB on metal studs. Roofing is EPDM on continuous insulation. Electrical, plumbing and HVAC systems are included. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists water treatment facility upgrade. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 1, 2026
Release: Dec 3, 2025
Close: Jan 1, 2026
Project consists water treatment facility upgrade. See outside link.
AvailablePremium
Access the largest public sector contact database
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailableThe Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
The Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
AvailableWork includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 14, 2026
Release: Nov 7, 2025
Close: Jan 14, 2026
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis