CountyFL
Posted
Aug 10, 2026
Nov 23, 2026
Separated Shared Use Path Phase 1 RFP
Work includes separated shared use path.
Description: The City of Wichita is seeking bids from firm(s) to provide construction services for the Public Works & Utilities Department.
City · KS, US
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Aug 10, 2026
Nov 23, 2026
Work includes separated shared use path.
CountyCA
Posted
Oct 28, 2026
Nov 19, 2026
Work includes 10,000 SF erosion control - hydroseed, 407 CY (f) roadway excavation (cut), 1,891 ton class ii 3/4" aggregate base, 342 LF concrete curb (type a1-6), 96 LF 12" diameter hdpe pipe, 20 lf remove (ex)12" diameter storm drain stubout pipe, 1 EA connect to existing storm drain, 3,843 SF concrete flatwork (6" thickness) (reinforced), 270 sf concrete sidewalk (4" thickness), 5 ton temporary hma ramp, 1 EA ada parking sign on single post r99c (ca). See attached file.
CityCA
Posted
Nov 2, 2026
Nov 23, 2026
Environmental clearance, technical studies, and engineering design services for the Seaport Boulevard Multi-Use Path Project.
CityIL
Posted
Oct 30, 2026
Nov 20, 2026
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Wichita.