Dutchess County
Work include 203 CY removal of substructures; 551 Cy unclassified excavation and disposal; 25 CY trench and culvert excavation; 20 LF rock excavation, non-explosive means; 528 SY seed and mulch - temporary; 354 SY miscellaneous cold milling of bituminous concrete; 47 LF steel bridge railing (two rail); 34 LF pre-cast concrete box culvert (fill height 24" or greater) 16' span, 5' rise; 165 Sy pre-cast concrete wingwall units for box culverts; 60 EA asphalt sidewalks, driveways, bicycle paths, and vegetation control strips.
Release
Jan 15, 2025
Close
Feb 18, 2025