CityWI
Jul 31, 2026
Closes
Aug 14, 2026
125th Street (Earl Road) Reconstruction and Paving Project RFP
Project generally consists of furnishing all labor, materials, equipment, transportation, supervision, and incidentals necessary to complete the roadway improvements, including but not limited to: mobilization and traffic control; protection of existing utilities, structures, driveways, and adjacent property; pulverization of the existing roadway; placement and compaction of 2" of aggregate base course; saw cutting and removal of existing pavement where required; fine grading and compaction of the roadway; placement of 2.5" of hot mix asphalt pavement on an approximately twenty (20) foot wide roadway, including the existing cul-de-sac; construction of two (2) feet compacted aggregate shoulders on both sides of the roadway where applicable; final grading, restoration, cleanup, and all incidental work.