CityWI
Jul 22, 2026
Closes
Aug 5, 2026
Reconstruction On Zeman Road RFP
Work includes : pulverize the existing roadway full width and ful1 depth; salvage pulverized material from sections 1 and 3 to a depth of 6", stockpile it temporarily in section 2, and reuse it as the initial layer of base course alter geogrid placement; in sections 1 and 3, excavate the roadway an additional 4" after pulverization and remove the excess material. Work shall include excavation, grading,, and compaction of the subgrade prior to geogrid installation; see attached file.