CityFL
Aug 20, 2026
Closes
Sep 24, 2026
Armsdale Road Drainage Improvements Phase 2 RFP
Project consists of but not limited to remove and replace the existing cross drains; install proposed elliptical reinforced concrete pipe, endwalls, inlets, outlet pipe, and drainage improvements within the roadway right-of-way and associated drainage easements; install outlet protection and riprap within the 20' unobstructed drainage easement; remove and replace existing headwalls, ditch paving, riprap, pavement, sidewalk, and other affected improvements; perform ditch grading, swale realignment, and site restoration; complete required jea water main and force main utility adjustments; provide erosion and sediment control, maintenance of traffic, pavement marking replacement, sodding, and all related work necessary to provide a complete and functional drainage improvement.