CityNC
Posted
May 12, 2026
Sep 29, 2026
Greenway Pedestrian Structures
Work includes structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures, structures #102 and #103 consists of replacing the existing timber decking with frp, structure #17 consists of replacing the existing timber structure with timber glu-lams and timber decking, structure #17 consists of replacing the existing timber structure with steel framing and frp decking.