Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of constructing sidewalk improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work entails approx 275 LF of 5-footwide sidewalk on the west side of street, including a public alley entrance. Bid alternate #1 work entails approx 290 LF of 5-foot-wide sidewalk on the west side of street, including two driveway entrances, plus a handicapped accessible ramp on the east side of street. Align new sidewalk and alley entrance with existing ramp and existing sidewalk. Align new sidewalk with existing ramp and existing sidewalk. Align new sidewalk and entrances with existing ramps. Excavation shall be performed as necessary so that finished grade is consistent with surrounding area. Excess excavated material shall be properly disposed of; etc, see attached file.
Posted Date
Jan 26, 2026
Due Date
Feb 10, 2026
Release: Jan 26, 2026
Close: Feb 10, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work entails approx 275 LF of 5-footwide sidewalk on the west side of street, including a public alley entrance. Bid alternate #1 work entails approx 290 LF of 5-foot-wide sidewalk on the west side of street, including two driveway entrances, plus a handicapped accessible ramp on the east side of street. Align new sidewalk and alley entrance with existing ramp and existing sidewalk. Align new sidewalk with existing ramp and existing sidewalk. Align new sidewalk and entrances with existing ramps. Excavation shall be performed as necessary so that finished grade is consistent with surrounding area. Excess excavated material shall be properly disposed of; etc, see attached file.
**ANNOUNCEMENT ONLY** MassDEP announces the Recycling and Reuse Business Development Grant (RBDG) Program. This grant program is focused on expanding the infrastructure for collection, reuse, recycling, and other defined processing for specified target materials. These grants are intended to help foster sustainable markets for the targeted materials and products, thereby adding value to municipal and business recycling and reuse efforts.
Posted Date
Dec 19, 2025
Due Date
Apr 4, 2026
Release: Dec 19, 2025
Close: Apr 4, 2026
**ANNOUNCEMENT ONLY** MassDEP announces the Recycling and Reuse Business Development Grant (RBDG) Program. This grant program is focused on expanding the infrastructure for collection, reuse, recycling, and other defined processing for specified target materials. These grants are intended to help foster sustainable markets for the targeted materials and products, thereby adding value to municipal and business recycling and reuse efforts.
AvailableEliminate current and future cracked and heaving sidewalks, curbs, and gutters on portions of West Cota Street, South Sixth Street, South Fifth Street, and West Railroad Avenue by: Removing existing tree stumps, heaved sidewalk, curb, and gutter; installing city-provided replacement trees; installing root barrier; and replacing sidewalk, curb, gutter, electrical boxes, water valve rings and covers, tree frames, and grates. Work includes traffic control and erosion prevention.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Eliminate current and future cracked and heaving sidewalks, curbs, and gutters on portions of West Cota Street, South Sixth Street, South Fifth Street, and West Railroad Avenue by: Removing existing tree stumps, heaved sidewalk, curb, and gutter; installing city-provided replacement trees; installing root barrier; and replacing sidewalk, curb, gutter, electrical boxes, water valve rings and covers, tree frames, and grates. Work includes traffic control and erosion prevention.
AvailableConstruct 5' wide sidewalk to the existing sidewalk.
Posted Date
Jan 13, 2026
Due Date
Feb 18, 2026
Release: Jan 13, 2026
Close: Feb 18, 2026
Construct 5' wide sidewalk to the existing sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →