Retrieving RFP details
Release
Close
City of Raleigh
Rehabilitation of approx. 3,425 LF of stormwater pipes with UV GRP CIPP Lining, cementitious coating and concrete repairs, drainage structure installation, concrete top installation, curb and gutter installation, traffic control.
Maryland Department of Transportation
Rehabilitation of existing stormwater management facilities.
City of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
Chitimacha Tribe of Louisiana
Provide climate resiliency/stormwater management, phase 1 project.
Borough of Seaside Park
Stormwater system maintenance equipment: mechanical street sweeper, vacuum truck, trailed mounted portable diesel generator, compact street sweeper.
Release
Jan 13, 2025
Close
Feb 12, 2025