Centre de Services Scolaire de La Beauce-Etchemin
School DistrictQC
Posted
Oct 15, 2026
Nov 12, 2026
Rétention des eaux pluviales au CIMIC
The Centre de services scolaire de la Beauce-Etchemin is soliciting bids to construct a stormwater retention basin at CIMIC. The project is classified as civil engineering construction involving drainage systems. The anticipated contract duration, excluding options, is five months.
