CityPA
Posted
Oct 15, 2026
Nov 3, 2026
Cherryville Road Sidewalk Extension RFP
Sidewalk Extension.
Description: Project includes constructing new sidewalk. Includes constructing new sidewalk, driveways, parking areas, retaining wall, ADA ramps, and reconstructing existing storm drain structures. Work includes 3,720 SF of roadway cross section; 212 LF of sawcut asphalt; 740 SF of remove and dispose of existing asphalt; 540 LF of 2. 5' standard curb and gutter; 560 LF of 5' standard sidewalk; 175 LF of redi-rock retaining wall; 22 LF of multi-use trail; dust control & watering; erosion control.
City · UT, US
Decision makers connected to this RFP from Town of Springdale.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Oct 15, 2026
Nov 3, 2026
Sidewalk Extension.
CityNJ
Posted
Oct 27, 2026
Nov 18, 2026
Installation of approx. 296 LF of curbing, 126 SY of sidewalk, 78 tons of hot mix asphalt pavement, one drainage inlet, and other incidental work along Peapack Road located in the Borough.
CityNY
Posted
Oct 16, 2026
Nov 13, 2026
The project involves extending a box culvert. Related sidewalk, curb, and gutter work is included. Pipe culvert construction is also part of the project.
CityIN
Posted
Oct 29, 2026
Nov 12, 2026
We will be adding new sidewalks and a boardwalk over the Bullerman Drain on the south side of St Joe Center Road from Lahmeyer Road to North Arlington Pkwy. We will also be improving the drainage with new drive culverts and regrading the ditch line. On the north side a new walk from Cherry Hill Pkwy to the bridge over the Mower Drain.