CityPA
Posted
Oct 16, 2026
Nov 6, 2026
PW Prequalification for Bid -3023 FY27 Signal Synchronization and Knockdown
Signal synchronization and knockdown project.
Description: Work include 77 CY excavation; 825 LF sawcutting; 125 CY foreign borrow excavation; 259 SY h. E. S. Plain cement concrete base course, 6" depth; 259 SY subbase 4" depth (no. 2a); 259 SY superpave asphalt mixture design, wearing course, pg 64s-22 3 to <10 million esals, 9.5 mm mix, 1 1/2" depth, srl-e; 518 SY asphalt tack coat; 174 LF plain cement concrete curb, 6" height, including removal of existing curb, philadelphia; 523 LF plain cement concrete curb, 8" height, including removal of existing curb, philadelphia; 2300 LF fiber optic cable, aerial, figure 8, 48-fiber; 48 LF plain cement concrete curb, 3" height, including removal of existing curb.
City · PA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Oct 16, 2026
Nov 6, 2026
Signal synchronization and knockdown project.
CityPA
Posted
Sep 18, 2026
Oct 28, 2026
Work include demolition and installation of ten (10) filter underdrain tanks.
CityPA
Posted
Oct 16, 2026
Nov 6, 2026
This is an open, prequalification-only public-works solicitation for Bid 3085, covering the 2800 Judson Street Rehabilitation Project. The City estimates the project at $1,000,000–$2,000,000, and approved sellers will be invited to the later closed bid solicitation. The bid opening is scheduled for November 5, 2026, at 11:59 p.m.; questions and clarifications are accepted through that same time.
CityPA
Posted
Sep 18, 2026
Oct 27, 2026
Work include replacing the glycol system and underground piping, installing new electric boilers, replacing air handling units (ahus) and motor control centers (mccs), and removing and safely disposing of lead paint found in mechanical rooms.
Decision makers connected to this RFP from City of Philadelphia.