CityPA
Posted
Sep 15, 2026
Oct 29, 2026
PW Prequalification Bid 6718 - PHL-1940.54 Passenger Boarding Bridge Replacement - Phase 4
The intent of this project is to enhance passenger convenience, security and safety during enplanement / deplanement by removing and replacing existing passenger boarding bridges. The replacement work also includes consideration of foundation renovations, line striping upgrades, and access and security system upgrades at each impacted gate. Limited work to remove and replace the existing door interface panels and hardware on the interior of the terminal are planned.
