Retrieving RFP details
Release
Close
City of Philadelphia
Work includes installation of new withdrawable circuit breakers at existing spaces of substations; replacement of control power transformers (cpts) at mts and ian; replacements, remediation and testing of oil filled transformers; replacement of capacitor banks at mts and ian; replacement of medium voltage circuit breakers; replacement of medium voltage cables; replacement of bus differential relays; replacement of transformer differential relays; provide new grounding system required for new installations; provide raceways and ductbanks as required.
bulk
zip
City of Richland
Prequalify for electrical utility work, which may include electrical distribution (2400V - 15,000V), electrical transmission (52,000V - 230,000V), electrical substation (2400V - 230,000V), and secondary electrical systems (0V to 600V).
San Diego Metropolitan Transit System
Provide KMD ZEB Infrastructure Phase 1 - Prequalification of Bidders
Franklin County Public Utility District 1
Electrical work: Electrical substation, transmission, and distribution construction; streetlights; dock crew projects; meter testing; pole testing and treatment; and tree trimming around electrical lines. Fiber work: Splicing; and overhead and/or underground fiber construction.
Palm Beach County
Provide electrical services.
Release
Oct 01, 2024
Close
Nov 14, 2024