Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation is a pre-qualification (PQ) only for the City of Philadelphia’s 2026 Milling Highway Districts 3 & 4 project, seeking pre-qualified contractors with experience in highway milling and resurfacing. Approved sellers who pass pre-qualification will be notified and invited to a subsequent closed bid solicitation; the estimated project range is greater than $5,000,000. The procurement is managed by the City of Philadelphia Streets Department, with bidding open on 2026-01-13 and closing on 2026-01-29 (bid open type: OPEN, prequalification only).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide speed cushion on-call that includes sheathing and shoring; reinforced steel; welded steel wire fabric; welded steel wire fabric with epoxy coating; saw cutting - roadway; saw cutting - footway; penndot 2a modified stone for vaults; penndot 2a modified stone for subgrade. See attached file.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Provide speed cushion on-call that includes sheathing and shoring; reinforced steel; welded steel wire fabric; welded steel wire fabric with epoxy coating; saw cutting - roadway; saw cutting - footway; penndot 2a modified stone for vaults; penndot 2a modified stone for subgrade. See attached file.
AvailableWorks include approx. 20,039 TN 4" recycled asph conc patching, including Bitum Matl and H lime; 380,446 SY mill asph conc pvmt.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Works include approx. 20,039 TN 4" recycled asph conc patching, including Bitum Matl and H lime; 380,446 SY mill asph conc pvmt.
AvailableWork includes 2,200 CY of excavation for sewer pipes; 1,845 LF of 18" rcp sewer; 265 LF of 30" rcp sewer; 1,370 LF of 6" lateral connections; 25 SY of concrete footway paving; 5,610 SY of milling; 1,630 SY of plain cement concrete base course, 8" depth, (including subgrading); 6,170 SY of superpave wearing course, 64-22 pg, 1-1/2 depth, type a; construction and as builts of 6" thick ADA ramps; 100 LF of 36" DI pipe; 3,400 LF of 3/4" copper service pipe from water main to curb stop; see attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 2,200 CY of excavation for sewer pipes; 1,845 LF of 18" rcp sewer; 265 LF of 30" rcp sewer; 1,370 LF of 6" lateral connections; 25 SY of concrete footway paving; 5,610 SY of milling; 1,630 SY of plain cement concrete base course, 8" depth, (including subgrading); 6,170 SY of superpave wearing course, 64-22 pg, 1-1/2 depth, type a; construction and as builts of 6" thick ADA ramps; 100 LF of 36" DI pipe; 3,400 LF of 3/4" copper service pipe from water main to curb stop; see attached file.
Work includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis