Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide speed cushion on-call that includes sheathing and shoring; reinforced steel; welded steel wire fabric; welded steel wire fabric with epoxy coating; saw cutting - roadway; saw cutting - footway; penndot 2a modified stone for vaults; penndot 2a modified stone for subgrade. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Philadelphia (Department of Aviation) is soliciting pre-qualification submissions for the Terminal BC Baggage Roof Replacement at Philadelphia International Airport, covering removal and replacement of roof systems, insulation, selective structural repairs, new SBS and PVC roofing, skylight replacement, HVAC condensate/heat tape modifications, and new roof enclosures with EIFS finish and access doors. This solicitation is a pre-qualification (PQ) invitation for bidding for an estimated project > $5,000,000; a non-mandatory pre-bid/site walk is scheduled for 2026-01-06 at 1:30 PM local time. The solicitation was posted 2025-12-23 and is open (Bid Opening Date 2026-01-13 11:59 PM local); attachments (project manual, drawings, prequal questionnaire) are listed on the buyer's posting but direct file downloads were not accessible during scraping.
Posted Date
Dec 23, 2025
Due Date
Jan 14, 2026
Release: Dec 23, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 14, 2026
The City of Philadelphia (Department of Aviation) is soliciting pre-qualification submissions for the Terminal BC Baggage Roof Replacement at Philadelphia International Airport, covering removal and replacement of roof systems, insulation, selective structural repairs, new SBS and PVC roofing, skylight replacement, HVAC condensate/heat tape modifications, and new roof enclosures with EIFS finish and access doors. This solicitation is a pre-qualification (PQ) invitation for bidding for an estimated project > $5,000,000; a non-mandatory pre-bid/site walk is scheduled for 2026-01-06 at 1:30 PM local time. The solicitation was posted 2025-12-23 and is open (Bid Opening Date 2026-01-13 11:59 PM local); attachments (project manual, drawings, prequal questionnaire) are listed on the buyer's posting but direct file downloads were not accessible during scraping.
AvailableThis project consists of the removal of existing roof membrane, insulation, non-structural LWC, associated flashings, and select roof-top equipment; infill of roof openings exposed during demolition; replacement of deteriorated and/or provision of supplemental framing and blocking; provision of R30 insulation and tapered insulation; provision of SBS modified bitumen roof with associated flashings, accessories; provision of scuppers, downspouts and their accessories; provision of PVC roof with associated flashings and accessories; selective replacement of roof drain components; provision of roof ladders, ladder cages, non-penetrating roof stairs, guardrail assemblies, and fall-protection anchors; provision of walkpads; replacement of unit skylights; replacement and/or modification of HVAC condensate lines; replacement and/or modification of heat tapes; construction enclosures with EIFS finish and access doors.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
This project consists of the removal of existing roof membrane, insulation, non-structural LWC, associated flashings, and select roof-top equipment; infill of roof openings exposed during demolition; replacement of deteriorated and/or provision of supplemental framing and blocking; provision of R30 insulation and tapered insulation; provision of SBS modified bitumen roof with associated flashings, accessories; provision of scuppers, downspouts and their accessories; provision of PVC roof with associated flashings and accessories; selective replacement of roof drain components; provision of roof ladders, ladder cages, non-penetrating roof stairs, guardrail assemblies, and fall-protection anchors; provision of walkpads; replacement of unit skylights; replacement and/or modification of HVAC condensate lines; replacement and/or modification of heat tapes; construction enclosures with EIFS finish and access doors.
AvailableStream restoration and sewer reconstruction in corridor improvement. Including 1,400 CY excavation for pipe sewers; 165 LF of 15" VCP Sanitary Sewer Encased in Concrete'181 LF of 18" VCP Sanitary Sewer; 3 ea Sewer Manholes for Pipes 30" and Under; 1 LF Trail Restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Stream restoration and sewer reconstruction in corridor improvement. Including 1,400 CY excavation for pipe sewers; 165 LF of 15" VCP Sanitary Sewer Encased in Concrete'181 LF of 18" VCP Sanitary Sewer; 3 ea Sewer Manholes for Pipes 30" and Under; 1 LF Trail Restoration.
AvailableWork includes 2,200 CY of excavation for sewer pipes; 1,845 LF of 18" rcp sewer; 265 LF of 30" rcp sewer; 1,370 LF of 6" lateral connections; 25 SY of concrete footway paving; 5,610 SY of milling; 1,630 SY of plain cement concrete base course, 8" depth, (including subgrading); 6,170 SY of superpave wearing course, 64-22 pg, 1-1/2 depth, type a; construction and as builts of 6" thick ADA ramps; 100 LF of 36" DI pipe; 3,400 LF of 3/4" copper service pipe from water main to curb stop; see attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 2,200 CY of excavation for sewer pipes; 1,845 LF of 18" rcp sewer; 265 LF of 30" rcp sewer; 1,370 LF of 6" lateral connections; 25 SY of concrete footway paving; 5,610 SY of milling; 1,630 SY of plain cement concrete base course, 8" depth, (including subgrading); 6,170 SY of superpave wearing course, 64-22 pg, 1-1/2 depth, type a; construction and as builts of 6" thick ADA ramps; 100 LF of 36" DI pipe; 3,400 LF of 3/4" copper service pipe from water main to curb stop; see attached file.