Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,200 CY of excavation for sewer pipes; 1,845 LF of 18" rcp sewer; 265 LF of 30" rcp sewer; 1,370 LF of 6" lateral connections; 25 SY of concrete footway paving; 5,610 SY of milling; 1,630 SY of plain cement concrete base course, 8" depth, (including subgrading); 6,170 SY of superpave wearing course, 64-22 pg, 1-1/2 depth, type a; construction and as builts of 6" thick ADA ramps; 100 LF of 36" DI pipe; 3,400 LF of 3/4" copper service pipe from water main to curb stop; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sewer reconstruction and relay of water mains and construction of green stormwater infrastructure. Includes 25 LF of 24" RCP Sewer; 295 LF of 30" RCP Sewer; 5 LF of 12" Vent Connections; 55 LF of 15" Inlet connections; 3 ea Sewer Manholes for Pipes 30" and Under; 250 SY of Plain Cement Concrete Base Course, 8" Depth, (Including Subgrading); 235 LF Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A; 50 SY Superpave 64-22 PG, Type A, ( 1-1/2 inch Binder Course and 1-1/2" Wearing Course); 445 LF of 6" DI Pipe; 1,910 LF of 8" DI pipe; 225 LF of 3/4" copper service pipe from water main to curb stop; 30 LF of 1" copper service pipe from water main to curb stop; 30 LF of 3/4" copper supply pipe from curb stop to meter; 300 SY Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Sewer reconstruction and relay of water mains and construction of green stormwater infrastructure. Includes 25 LF of 24" RCP Sewer; 295 LF of 30" RCP Sewer; 5 LF of 12" Vent Connections; 55 LF of 15" Inlet connections; 3 ea Sewer Manholes for Pipes 30" and Under; 250 SY of Plain Cement Concrete Base Course, 8" Depth, (Including Subgrading); 235 LF Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A; 50 SY Superpave 64-22 PG, Type A, ( 1-1/2 inch Binder Course and 1-1/2" Wearing Course); 445 LF of 6" DI Pipe; 1,910 LF of 8" DI pipe; 225 LF of 3/4" copper service pipe from water main to curb stop; 30 LF of 1" copper service pipe from water main to curb stop; 30 LF of 3/4" copper supply pipe from curb stop to meter; 300 SY Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A. See attached file.
AvailableWork includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Work includes 200 LF of sewer lining of 3'-6" brick/ 42" rcp sewer on frankford avenue using epoxy resin; rehabilitation of sewer manholes; 6,700 CY of excavation for pipe sewers; 500 CY of excavation for pipe sewers including sheeting and shoring; 100 LF of 18" rcp sewer; 395 LF of 21" rcp sewer; 1,110 LF of 54" class v rcp sewer; 1,245 LF of concrete curb; 4,850 SY of concrete footway paving; 100 SY of concrete driveway paving, 8" depth; 385 SY of milling; 1,095 CY of excavation for water mains; 2,605 LF of 8" DI pipe and associated works. See attached files.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 200 LF of sewer lining of 3'-6" brick/ 42" rcp sewer on frankford avenue using epoxy resin; rehabilitation of sewer manholes; 6,700 CY of excavation for pipe sewers; 500 CY of excavation for pipe sewers including sheeting and shoring; 100 LF of 18" rcp sewer; 395 LF of 21" rcp sewer; 1,110 LF of 54" class v rcp sewer; 1,245 LF of concrete curb; 4,850 SY of concrete footway paving; 100 SY of concrete driveway paving, 8" depth; 385 SY of milling; 1,095 CY of excavation for water mains; 2,605 LF of 8" DI pipe and associated works. See attached files.
45 LF of 18" RCP Sewer; 190 LF of 36" RCP Sewer; 12" Vent Connections; 75 LF of 15" Inlet connections; 1 ea Sewer Manholes for Pipes 36" and Over; 1 ea Sewer Transition Manhole for pipes 30" and less; 1 ea Sewer Transition Manhole for pipes 36"s and over; 40 LF of 6" DI pipe; 570 LF of 8" DI pipe; 1 ton ductile iron fitting; 50 LF of 3/4" copper service pipe from water main to curb stop; 10 LF of 3/4" copper supply pipe from curb stop to meter; 125 LF of 8" solid HDPE pipe; 481 LF of 8" perforated HDPE pipe ; 181 LF of 12" solid PP pipe; 970 LF of 12" perforated PP pipe; 242 LF of 8" solid PVC pipe; 775 LF of 8" DI pipe; 95 LF of 12" DI pipe; 50 LF of Shallow 8" DI pipe, concrete encased. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
45 LF of 18" RCP Sewer; 190 LF of 36" RCP Sewer; 12" Vent Connections; 75 LF of 15" Inlet connections; 1 ea Sewer Manholes for Pipes 36" and Over; 1 ea Sewer Transition Manhole for pipes 30" and less; 1 ea Sewer Transition Manhole for pipes 36"s and over; 40 LF of 6" DI pipe; 570 LF of 8" DI pipe; 1 ton ductile iron fitting; 50 LF of 3/4" copper service pipe from water main to curb stop; 10 LF of 3/4" copper supply pipe from curb stop to meter; 125 LF of 8" solid HDPE pipe; 481 LF of 8" perforated HDPE pipe ; 181 LF of 12" solid PP pipe; 970 LF of 12" perforated PP pipe; 242 LF of 8" solid PVC pipe; 775 LF of 8" DI pipe; 95 LF of 12" DI pipe; 50 LF of Shallow 8" DI pipe, concrete encased. See attached file.