Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,345 SY of excavation for sewer pipes; 2,220 LF of 18" rcp sewer; 1,870 LF of 6" lateral connections; 2,000 LF of concrete curb; 2,125 SY of concrete footway paving; 1,825 SY of subbase, 6 inch depth, including subgrading; construction and as builts of 15 EA of 6" thick ADA ramps; 1,170 CY of excavation for water pipes; 2,770 LF of 8" DI pipe; ductile iron fittings; 4 ea of 6" gate valves; 3,450 LF of 3/4" copper service pipe from water main to curb stop; 2,000 LF of concrete curb; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Philadelphia Water Department is conducting a prequalification-only solicitation for a project involving sewer reconstruction, relay of water mains, and construction of green stormwater infrastructure in the Westmoreland area. Approved, prequalified sellers will be invited to the subsequent closed bid solicitation. The estimated value is over $5,000,000 and the bid is currently open.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
The City of Philadelphia Water Department is conducting a prequalification-only solicitation for a project involving sewer reconstruction, relay of water mains, and construction of green stormwater infrastructure in the Westmoreland area. Approved, prequalified sellers will be invited to the subsequent closed bid solicitation. The estimated value is over $5,000,000 and the bid is currently open.
AvailableThe City of Philadelphia (Water Department) issued a prequalification Invitation for Bid (PW Prequal Bid 2561) for sewer reconstruction and relay of water mains on Craig Street and Solly Avenue. This solicitation is for pre-qualification only; approved sellers will be invited to a subsequent closed bid solicitation and the estimated project value is over $5,000,000. Bids are open (available 2025-12-12) and close on 2026-01-08; questions should be emailed to Rosina.DePasquale@phila.gov by January 13, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
The City of Philadelphia (Water Department) issued a prequalification Invitation for Bid (PW Prequal Bid 2561) for sewer reconstruction and relay of water mains on Craig Street and Solly Avenue. This solicitation is for pre-qualification only; approved sellers will be invited to a subsequent closed bid solicitation and the estimated project value is over $5,000,000. Bids are open (available 2025-12-12) and close on 2026-01-08; questions should be emailed to Rosina.DePasquale@phila.gov by January 13, 2026.
45 LF of 18" RCP Sewer; 190 LF of 36" RCP Sewer; 12" Vent Connections; 75 LF of 15" Inlet connections; 1 ea Sewer Manholes for Pipes 36" and Over; 1 ea Sewer Transition Manhole for pipes 30" and less; 1 ea Sewer Transition Manhole for pipes 36"s and over; 40 LF of 6" DI pipe; 570 LF of 8" DI pipe; 1 ton ductile iron fitting; 50 LF of 3/4" copper service pipe from water main to curb stop; 10 LF of 3/4" copper supply pipe from curb stop to meter; 125 LF of 8" solid HDPE pipe; 481 LF of 8" perforated HDPE pipe ; 181 LF of 12" solid PP pipe; 970 LF of 12" perforated PP pipe; 242 LF of 8" solid PVC pipe; 775 LF of 8" DI pipe; 95 LF of 12" DI pipe; 50 LF of Shallow 8" DI pipe, concrete encased. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Work includes 270 LF of lining of 270 LF of 12' tc sewer ; 345 LF of lining of 345 LF of 2'-3"x1'-6" brick sewer; 1,255 CY of excavation for pipe sewers; 985 LF of 18" rcp sewer; 706 LF of 6" lateral connections; 1,900 LF of concrete curb; 1,300 SY of concrete footway paving; 156 SY of brick cartway paving; construction and as builts of 19 EA of 6" thick ada ramps; 1,230 CY of excavation for water mains; 2,910 LF of 8" di pipe; 2,870 LF of 3/4" copper service pipe from water main to curb stop; 1,215 LF of concrete curb. See attached files.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 270 LF of lining of 270 LF of 12' tc sewer ; 345 LF of lining of 345 LF of 2'-3"x1'-6" brick sewer; 1,255 CY of excavation for pipe sewers; 985 LF of 18" rcp sewer; 706 LF of 6" lateral connections; 1,900 LF of concrete curb; 1,300 SY of concrete footway paving; 156 SY of brick cartway paving; construction and as builts of 19 EA of 6" thick ada ramps; 1,230 CY of excavation for water mains; 2,910 LF of 8" di pipe; 2,870 LF of 3/4" copper service pipe from water main to curb stop; 1,215 LF of concrete curb. See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
45 LF of 18" RCP Sewer; 190 LF of 36" RCP Sewer; 12" Vent Connections; 75 LF of 15" Inlet connections; 1 ea Sewer Manholes for Pipes 36" and Over; 1 ea Sewer Transition Manhole for pipes 30" and less; 1 ea Sewer Transition Manhole for pipes 36"s and over; 40 LF of 6" DI pipe; 570 LF of 8" DI pipe; 1 ton ductile iron fitting; 50 LF of 3/4" copper service pipe from water main to curb stop; 10 LF of 3/4" copper supply pipe from curb stop to meter; 125 LF of 8" solid HDPE pipe; 481 LF of 8" perforated HDPE pipe ; 181 LF of 12" solid PP pipe; 970 LF of 12" perforated PP pipe; 242 LF of 8" solid PVC pipe; 775 LF of 8" DI pipe; 95 LF of 12" DI pipe; 50 LF of Shallow 8" DI pipe, concrete encased. See attached file.