Summary
Project includes the removal of existing process mechanical, structural, and electrical systems within the dewatering/centrifuge building, cake storage building, and adjacent outdoor areas. The work involves dismantling and disposing of tanks, piping, equipment, controls, and support structures, along with repairing penetration openings and restoring affected areas. The project will prepare the facility for installation of future fog processing equipment. Need location. Work includes, but not limited to furnishing all labor, materials, equipment, and incidentals required to complete the demolition and removal of existing systems in preparation for future fog processing improvements. Work will be performed within the dewatering/centrifuge building, the cake storage building, and adjacent outdoor areas.