Wisconsin Department of Administration
State AgencyWI
Posted
Oct 16, 2026
Dec 2, 2026
Description: Purdue Memorial Union Electrical Distribution Replacement Phase V.
HigherEducation · IN, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
71 days before RFP
The Purdue Board of Trustees approved the 10-year capital plan, which identified Student Union and Library Renovation Phase One at Purdue West for state funding support.
Um, two of four projects in the near term uh were identified for uh state uh funding support and these two are the health science and engineering hub building on our Indianapolis campus and the student union and library renovation phase one at Purduna West. The first system priority project is the proposed $275 million health science and engineering hub…
Purdue Board Of Trustees Regular Meeting
Board meeting · Aug 7, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (17 days left)
Decision makers connected to this RFP from Purdue University Main Campus.
Adjacent opportunities open for bidding right now.
Wisconsin Department of Administration
State AgencyWI
Posted
Oct 16, 2026
Dec 2, 2026
This project replaces aged electrical distribution systems for hunt arena including main distribution switchboard and building motor control center.
Greenville Utilities Commission
Special DistrictNC
Posted
-
Nov 19, 2026
Replacement of 12. 47 kv distribution structures along the grid phase 2. This specification covers the installation, removal, transfers, and materials of 287 distribution structures along the grid. Any costs associated with guying, anchors, and service transfers should be included in the pole-top assembly cost. Old distribution structures along the grid will be replaced with new poles. The existing structures will be removed. All transfers are the responsibility of the contractor. Existing conductors will be attached to new poles. Existing copper neutral conductor running along w longmeadow road will be replaced with 1/0 acsr conductor. Old existing switches and transformers will be replaced including associated ground connections. All hardware and insulators will be replaced. The proposal submitted by the contractor shall include all labor, equipment, and all other necessary items to complete this project.
Mahoning Valley Sanitary District
Special DistrictOH
Posted
Oct 15, 2026
Nov 17, 2026
Work includes approx 2,184 SY 2" pavement planing, asphalt concrete; 584 LF of 15" conduit, type c (storm sewer); 157 CY asphalt concrete surface course, type 1; 1.560 LF of 36" water main ductile iron pipe ansi class 52, mechanical joints and fittings.
Higher EducationIN
Posted
Sep 24, 2026
Nov 12, 2026
Elevator modernization project.