OtherUT
Posted
Oct 8, 2026
Nov 4, 2026
First Step House- Gutter and Siding Replacement (Invitation to Bid)
Project will include removing and replacing the existing siding and gutters, as well as installing gutter guards.
Description: Washington State University is seeking sealed bids for siding replacement at Kalkus Hall at its Puyallup Research and Extension Center. The work includes removing the existing board-and-batten wood siding, reinstalling wall-mounted fixtures, and installing a weather barrier, sheet-metal siding, flashing, and trim, with four optional alternates. Substantial completion is required by May 1, 2027, and the bid opening is scheduled for November 17, 2026, at 2:30 PM.
HigherEducation · WA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
OtherUT
Posted
Oct 8, 2026
Nov 4, 2026
Project will include removing and replacing the existing siding and gutters, as well as installing gutter guards.
CityTN
Posted
Sep 10, 2026
Oct 20, 2026
Water treatment plant siding and window replacement. Scope of work includes - Remove old Hardie board siding; Install hat channel strips fastened to metal studs; Add 3/4" semi-permeable polystyrene foam insulation board; Install approx. 9,400 SF of metal board and batten siding; Caulk and seal where required; Replace (8) exterior windows with comparable replacement windows. Frame under existing sills to bring bottom of existing window up and off the brick ledge; see outside link.
Higher EducationIN
Posted
-
Oct 28, 2026
Indiana State University is seeking bids to replace the Jones Hall Residence Hall roof on its Terre Haute campus. A pre-bid meeting is scheduled at Jones Hall for October 21, 2026, at 10:00 a.m. Bids are due at the university’s Office of Procurement on October 28, 2026, at 2:00 p.m. local time.
Special DistrictMA
Posted
Sep 2, 2026
Oct 22, 2026
General contractors for the phase 4 replacement of aluminum siding with composite and vinyl siding, removal of wood clapboards with lead paint and replacement of existing front porch enclosures.