CityOH
Aug 20, 2026
Closes
Sep 10, 2026
Rock Road Lift Station Force Main Replacement - Phase 1
Work includes approx 5,800 LF of 12" force main.
Description: Construction of a new sanitary pump station, force main, and related sewer and supporting system improvements.
SpecialDistrict · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityOH
Aug 20, 2026
Closes
Sep 10, 2026
Work includes approx 5,800 LF of 12" force main.
CityGA
Aug 11, 2026
Closes
Sep 11, 2026
The City of Valdosta is soliciting construction bids for the Stallings Lift Station & Force Main Improvements project, including a new sanitary sewage lift station and approximately 3,800 linear feet of sewer force main. The work also includes demolition, repairs, patching, grading, grassing, and compliance with applicable Georgia Department of Transportation and City of Valdosta standards, with a 300-calendar-day performance period. This is an open public-works procurement, not a grant program, with a response deadline of September 11, 2026 and a mandatory pre-bid meeting scheduled for August 25, 2026.
Aug 10, 2026
Closes
Sep 1, 2026
Lift station and force main modifications at the lift station site include removal and replacement of lift station pumps, removal and replacement of the 12" plug valve at the lift station, retaining wall improvements, and electrical improvements. Lift station and force main modifications outside of the lift station site include the tie-in of the force main to a new manhole, abandoning 5,500 LF of 10" force main downstream of the tie in, abandonment of 7 ARVS, and use of flowable fill to abandon the force main along skyline drive. The scope of work includes lining 1,170 LF of 10" force main, lining of 3,600 LF of 12" gravity sewer including light cleaning and televising, and lining 940 LF of 10" gravity sewer, including light cleaning and televising. Included in the project is lining of 22 manholes, the installation of two (2) new manholes complete with pressure testing and vacuum testing (as apart of the force main tie-in). Alternate items include force main condition assessment and force main televising.
Special DistrictTX
Jul 30, 2026
Closes
Aug 25, 2026
Project includes approx. 4,823 LF of 10" AWWA C-900 DR-18, Class 235 PVC (green) force main; 2,690 LF of 10" AWWA C-900 DR-18, Class 235 PVC (green) force main; 466 LF of 10" AWWA C-900 DR-18, Class 235 PVC (green) force main.
Procurement and program contacts connected to North Shore Sanitary District.