Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The solicitation seeks municipal sewer infrastructure rehabilitation in Bristol, Virginia, including installation of approximately 403 linear feet of 8-inch gravity sewer and UV-cured CIPP lining of roughly 9,470 linear feet of existing 8–12 inch sewer lines, plus lateral reconnections and manhole locating/raising. The opportunity was posted 2025-11-06 with proposals due 2025-12-09 and is an active non-federal construction/rehabilitation procurement open to qualified contractors (not a grant).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work generally includes, but is not limited to: the rehab construction of a single-family residence. Scope of work: Fencing - existing cedar fence at NE corner of lot to be moved to property line once old concrete is removed. Approx. 32 LF. Landscaping - Install landscaping per landscape plan. Remove large elm tree in back yard. Install sprinkler irrigation system to entire landscape area. See attached file.
Posted Date
Dec 30, 2025
Due Date
Jan 26, 2026
Release: Dec 30, 2025
Close: Jan 26, 2026
Work generally includes, but is not limited to: the rehab construction of a single-family residence. Scope of work: Fencing - existing cedar fence at NE corner of lot to be moved to property line once old concrete is removed. Approx. 32 LF. Landscaping - Install landscaping per landscape plan. Remove large elm tree in back yard. Install sprinkler irrigation system to entire landscape area. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
French Creek Elementary School Site Improvements Project.
Posted Date
Nov 17, 2025
Due Date
Jan 28, 2026
Release: Nov 17, 2025
Close: Jan 28, 2026
French Creek Elementary School Site Improvements Project.
AvailableWork includes 250 CY mass rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 750 CY trench rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 270 LF drilled micropiles; 1 LS construction of the lab/admin building addition as shown in the plans; 1 LS schneider variable frequency drives (vfds) and motor control centers (mcc), complete as specified in section 16260 and 16920, respectively; 1 LS spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a; 1 LS schneider spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 3, 2026
Release: Dec 22, 2025
Close: Feb 3, 2026
Work includes 250 CY mass rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 750 CY trench rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 270 LF drilled micropiles; 1 LS construction of the lab/admin building addition as shown in the plans; 1 LS schneider variable frequency drives (vfds) and motor control centers (mcc), complete as specified in section 16260 and 16920, respectively; 1 LS spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a; 1 LS schneider spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a. See outside link.
AvailableWork include approx. 9,650 SF of Preparation of Wall Surfaces; 500 SF of Repair Stone Wall (Undistributed); 9,650 SF of Repointing Stone Wall; 130 CY of Cast In Place Reinforcement Wall, Complete; 1 LS of Erosion & Sedimentation Control.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Work include approx. 9,650 SF of Preparation of Wall Surfaces; 500 SF of Repair Stone Wall (Undistributed); 9,650 SF of Repointing Stone Wall; 130 CY of Cast In Place Reinforcement Wall, Complete; 1 LS of Erosion & Sedimentation Control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →