Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 250 CY mass rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 750 CY trench rock excavation, complete, and disposal (minimum bid = $75 per cubic yard); 270 LF drilled micropiles; 1 LS construction of the lab/admin building addition as shown in the plans; 1 LS schneider variable frequency drives (vfds) and motor control centers (mcc), complete as specified in section 16260 and 16920, respectively; 1 LS spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a; 1 LS schneider spare sections for mcc-d loads in the new motor control center (mcc-40) as shown in the electrical drawings 40 e-001a and 40 e-604a. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
WWTF implementation of flood controls including, structural, site, architectural and electrical improvements.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
WWTF implementation of flood controls including, structural, site, architectural and electrical improvements.
AvailableWest Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
West Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Work includes construction of a garage pole building with delegated design of the structure (approx 2,500 SF), which includes an office and site work. The project consists of furnishing power, electrical and control work for the project. The project consists of furnishing plumbing, heating and ventilation for the project.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
Work includes construction of a garage pole building with delegated design of the structure (approx 2,500 SF), which includes an office and site work. The project consists of furnishing power, electrical and control work for the project. The project consists of furnishing plumbing, heating and ventilation for the project.
AvailableWork generally includes, but is not limited to: the rehab construction of a single-family residence. Scope of work: Fencing - existing cedar fence at NE corner of lot to be moved to property line once old concrete is removed. Approx. 32 LF. Landscaping - Install landscaping per landscape plan. Remove large elm tree in back yard. Install sprinkler irrigation system to entire landscape area. See attached file.
Posted Date
Dec 30, 2025
Due Date
Jan 26, 2026
Release: Dec 30, 2025
Close: Jan 26, 2026
Work generally includes, but is not limited to: the rehab construction of a single-family residence. Scope of work: Fencing - existing cedar fence at NE corner of lot to be moved to property line once old concrete is removed. Approx. 32 LF. Landscaping - Install landscaping per landscape plan. Remove large elm tree in back yard. Install sprinkler irrigation system to entire landscape area. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis