Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will replace four (4) in-ground heavy-duty lifts with new 40-foot scissors lifts; 4 EA modification of each existing pit to accept the rear post of the new lift, according to the manufacturer's drawings and instructions; 4 EA aw cutting of floor and installation of 4-inch schedule 40 pvc drainpipe, shallow sump and installation of 8-inch floor drain in each pit. Each drain must be tied into the existing oil/water separator system. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Somerset Berkley Regional School District is soliciting bids for Phase 2 of the Chace Street Window Replacement Project at Chace Elementary School, which includes removing existing windows and installing new aluminum frame factory-glazed units plus associated masonry, carpentry, and painting work. The project has an estimated value of $1,095,000 and bidders must meet contractor qualifications and provide bid security (5% minimum). A pre-bid conference is scheduled for January 12, 2026 at 3:40 PM at 538 Chace St, Somerset, MA, and the response deadline is January 29, 2026.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
The Somerset Berkley Regional School District is soliciting bids for Phase 2 of the Chace Street Window Replacement Project at Chace Elementary School, which includes removing existing windows and installing new aluminum frame factory-glazed units plus associated masonry, carpentry, and painting work. The project has an estimated value of $1,095,000 and bidders must meet contractor qualifications and provide bid security (5% minimum). A pre-bid conference is scheduled for January 12, 2026 at 3:40 PM at 538 Chace St, Somerset, MA, and the response deadline is January 29, 2026.
AvailableReplacement of the steel roof of the main portion of the borough garage.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Replacement of the steel roof of the main portion of the borough garage.
AvailableThe City of Santa Monica is soliciting qualified contractors to replace pool tiles at the Annenberg Community Beach House as part of Phase 2 of the project. Bids must be submitted electronically through the City’s OpenGov vendor portal, with public bid-opening access immediately after close. The estimated project value range is $50,000–$150,000 and the solicitation was posted on January 6, 2026 with bids due February 20, 2026 at 2:30 PM local time.
Posted Date
Jan 6, 2026
Due Date
Feb 20, 2026
Release: Jan 6, 2026
Close: Feb 20, 2026
The City of Santa Monica is soliciting qualified contractors to replace pool tiles at the Annenberg Community Beach House as part of Phase 2 of the project. Bids must be submitted electronically through the City’s OpenGov vendor portal, with public bid-opening access immediately after close. The estimated project value range is $50,000–$150,000 and the solicitation was posted on January 6, 2026 with bids due February 20, 2026 at 2:30 PM local time.
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis