Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional services for a comprehensive Tunnel and Reservoir Plan (TARP) Mainstream Tunnel Inspection from drop shaft (DS) DS-M114N to construction shaft (CS) CS-ADD. The RFP is divided into four major tasks: i) Review documentation and develop a work plan to assess the condition, safety, and functionality of 5.26 mi. of 30-ft and 4.54 mi of 22-ft diameter rock tunnels, 34 drop shafts and 2 construction shafts, and all associated connecting tunnels; Coordinate, Schedule and Perform Inspection; Develop a condition assessment and recommended actions report, and Supplemental Services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
Posted Date
-
Due Date
Sep 30, 2028
Close: Sep 30, 2028
WVDOH Operations Division is soliciting qualifications to create a pre‑qualified list of consultants for bridge repair design plans and/or in‑service bridge and tunnel inspection services statewide, which may also include load rating analysis. Multiple assignments may begin in 2025 with quick turnaround requirements for repair design deliverables; multiple consultants may be selected.
AvailableRelease: Dec 3, 2025
Close: Dec 17, 2025
Professional health inspection services.
AvailableTunnel grouting services.
Posted Date
May 11, 2025
Due Date
Jan 12, 2026
Release: May 11, 2025
Close: Jan 12, 2026
Tunnel grouting services.
AvailableProvide tunnel cleaning services.
Posted Date
Nov 19, 2025
Due Date
Jan 13, 2026
Release: Nov 19, 2025
Close: Jan 13, 2026
Provide tunnel cleaning services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis