Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Allegheny County Sanitary Authority
Provide construction management or engineering firms interested in providing professional services for construction management (cm) for the river tunnel (art) project.
Posted Date
-
Due Date
Apr 10, 2026
Release: -
Allegheny County Sanitary Authority
Close: Apr 10, 2026
Provide construction management or engineering firms interested in providing professional services for construction management (cm) for the river tunnel (art) project.
AvailableAllegheny County Sanitary Authority
Provide physical/static model re-creation developed from existing documentation coordinated ; model size and scale, based on the current physical model, allowing for the current expansion of the site and all related structures built within it. ; model shall be constructed from materials appropriate for creating such physical/static model displays. ; an interactive, tactile feature shall be installed in the physical model to initiate audio cues for the viewer, that explain the purposes of each plant structure, as well as provide a general audio history of the plant, since inception. ; led lighting usage shall be implemented and function in tandem with the interactive module controls to highlight on focused areas by the viewer.
Posted Date
Nov 4, 2025
Due Date
Dec 11, 2025
Release: Nov 4, 2025
Allegheny County Sanitary Authority
Close: Dec 11, 2025
Provide physical/static model re-creation developed from existing documentation coordinated ; model size and scale, based on the current physical model, allowing for the current expansion of the site and all related structures built within it. ; model shall be constructed from materials appropriate for creating such physical/static model displays. ; an interactive, tactile feature shall be installed in the physical model to initiate audio cues for the viewer, that explain the purposes of each plant structure, as well as provide a general audio history of the plant, since inception. ; led lighting usage shall be implemented and function in tandem with the interactive module controls to highlight on focused areas by the viewer.
Allegheny County Sanitary Authority
Work includes approx 2,100 LF of full manhole to manhole Cured-In Place Pipe (CIPP) liner repair of 8" sanitary sewers, sanitary sewer cleaning, close circuit television (CCTV) inspection, and all necessary restoration and appurtenances for said construction. Alternates will be considered for approx 1,200 LF of CIPP liner and 18,400 LF of CCTV inspection and cleaning.
Posted Date
Feb 12, 2026
Due Date
Mar 2, 2026
Release: Feb 12, 2026
Allegheny County Sanitary Authority
Close: Mar 2, 2026
Work includes approx 2,100 LF of full manhole to manhole Cured-In Place Pipe (CIPP) liner repair of 8" sanitary sewers, sanitary sewer cleaning, close circuit television (CCTV) inspection, and all necessary restoration and appurtenances for said construction. Alternates will be considered for approx 1,200 LF of CIPP liner and 18,400 LF of CCTV inspection and cleaning.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Allegheny County Sanitary Authority
This document provides an overview of various GROW Grant Agreements, detailing their original and amended end dates, as well as requests for extensions. It categorizes agreements by when they were previously amended (Feb-April 2020), when extension requests were received (May 2020), and when extension requests are needed (June 2020). The agreements involve various Municipal Authorities and the PWSA for projects such as storm sewer separation, green infrastructure, and sanitary sewer rehabilitation.
Effective Date
Feb 1, 2020
Expires
Effective: Feb 1, 2020
Allegheny County Sanitary Authority
Expires:
This document provides an overview of various GROW Grant Agreements, detailing their original and amended end dates, as well as requests for extensions. It categorizes agreements by when they were previously amended (Feb-April 2020), when extension requests were received (May 2020), and when extension requests are needed (June 2020). The agreements involve various Municipal Authorities and the PWSA for projects such as storm sewer separation, green infrastructure, and sanitary sewer rehabilitation.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Allegheny County Sanitary Authority
The board meeting included informational updates such as the Wastewater Treatment Plant Expansion cost report, showing over $363 million in completed work, and the issuance of notice to proceed for the wet weather pump station. The board recognized receiving the NACWA National Environmental Achievement Award for the North End plan expansion project, specifically for operations and environmental performance. Updates were provided on several construction change orders, including those related to the energy recovery facility and the CSO bypass and disinfection project, involving equipment changes and meeting ALCOSAN standards. Furthermore, several action items were approved, including the authorization of payments for invoices exceeding specified thresholds, the award of contracts for miscellaneous sewer improvements and the delivery of defoaming agent, and approval of construction management services for sewer and valve replacement projects. The board also authorized advertisements for bids for chemical cleaning of filter media and for a new biosolids management service contract. Finally, several service authorizations for professional consultants were approved, including additional engineering support for stack testing and HVAC improvement projects, and a resolution was adopted to amend the sewage facilities plan for the Oakdale pump station and Robinson run interceptor sewer system.
The meeting focused on three informational items: background and overview of biosolids generation, the current biosolids management services contract (Contract 1743), and proposed contract modifications. Discussions covered the two operational systems for sludge processing, resulting in Class B biosolids (Alka-Sil) via lime stabilization, and incineration, noting a recent trend toward a 50/50 split between these methods. Details were provided on beneficial use options, including agricultural land application and tree trenching, alongside landfill disposal. The scope of the service provider's work, including hauling, permitting, soil sampling, logistics, application, monitoring, and reporting, was outlined. Proposed contract modifications include moving back to a single contract structure (removing the summer/winter split for beneficial use targets), updating the penalty and incentive program, and addressing potential regulatory changes, such as PAS limitations. The committee recommended advertising for a new biosolids management service contract.
The meeting commenced with an executive session during which no votes were taken, followed by the pledge of allegiance. The board proceeded with the reorganization by electing officers, confirming the slate for Chair, Vice Chair, Treasurer, Secretary, and Assistant Secretary/Treasurer. Key discussions included an overview of the tunnel program, which is the largest capital investment in the clean water program, composed of three projects including the Ohio River Tunnel and Alageney River Tunnel extensions. Progress on the Ohio River Tunnel, which is out for bid with a February 26, 2026 bid date, was detailed, including early works projects like demolition and site preparations at various shaft sites. Updates were provided on the Alageney River Tunnel and the upper Alagany consolidation sewer project, both currently in design phases. The role of the program management consultant team, led by Jacobs, in managing governance, budget, schedule, stakeholder engagement, and technical standards was outlined. The board also reviewed the geotechnical baseline report and risk management strategies. Action items included the approval of operating revenues and expenses for 2025, the 2026 capital budget status report, and the authorization of construction change orders, specifically related to repairs at the Energy Recovery Facility incinerator building and improvements at the dewatering facility.
The public meeting focused on an update regarding infrastructure investment both inside and outside the plant, coinciding with the organization's work on the Clean Water Plan. Key discussion points included the organization's role as the Allegheny County Sanitary Authority, providing wastewater treatment to 83 communities, and operating a single 50-acre treatment plant with a capacity of 250 million gallons per day. A significant problem discussed was the annual release of nine billion gallons of untreated overflow into rivers and streams during wet weather events due to combined sewer systems. The presentation detailed requirements of the Consent Decree, which mandates eliminating Sanitary Sewer Overflows (SSO) and reducing Combined Sewer Overflows (CSO). The modified Consent Decree, negotiated in 2008, extended compliance deadlines. The Clean Water Plan is the strategy to meet these requirements, split into four pillars: plant expansion, regional tunnel system, regionalization, and green infrastructure/source control. Plant expansion efforts include increasing secondary treatment capacity to 295 million gallons per day by 2025 and increasing wet weather capacity to 600 million gallons per day by 2029. Specific construction projects highlighted were the North End Plant Expansion (including process tanks and a river wall), the East Headworks project, the CSO bypass and disinfection project, construction of two new primary tanks and a wet weather pump station, and the building of a new parking garage to free up space for future expansion. Updates were also provided on the Return Activated Sludge (RAS) project and electrical distribution system upgrades.
The meeting commenced with a roll call and the pledge of allegiance, noting that the session was held virtually due to county quarantine measures. Key discussions involved the report on 2020 operating costs and revenue for the first quarter through March 31st, which indicated strong financial performance. Action items included authorizing bids for the return activated sludge pipe and pump replacement related to ongoing plant expansion. Contracts were approved for repairing leaks at the operations and maintenance facility, where cost increases were partially attributed to COVID-19 supply issues. Professional services agreements were authorized for G. Stephens company for engineering and consulting work at the laboratory industrial waste facility and parking garage (pre-construction services only), MS Consulting for engineering related to the Homestead transforming 12th avenue project, and GI Consulting for ongoing stack testing emissions monitoring. An award was recommended for effluent flushing water system improvements to Wade Trim, noting the system's role in reducing potable water costs. Additionally, modification services were approved for Mark USA to create a customer relations management system for the governmental affairs division to improve communication with municipalities. Finally, the board approved proposals recommended by the authorities risk management consultant for property casualty and workman's comp insurance, which came in under budget, and authorized the execution of a declaration of registration for the new vehicle maintenance garage storm water management plan.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Allegheny County Sanitary Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database