Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work under this Contract will include the replacement of the City’s Primary Sludge and Trickling Filter Recirculation Pumps at the City’s Wastewater Treatment Plant. Valves shall be ordered and installed as shown on the plans and electrical system shall be replaced in kind from the service disconnect switch through the pump.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes the construction of a new trickling filter structure, expansion of the disinfection contact basin, mechanical and electrical equipment upgrades, and rehabilitation of the solids holding tank.
Posted Date
Dec 16, 2025
Due Date
Feb 17, 2026
Release: Dec 16, 2025
Close: Feb 17, 2026
Project includes the construction of a new trickling filter structure, expansion of the disinfection contact basin, mechanical and electrical equipment upgrades, and rehabilitation of the solids holding tank.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The solicitation requests construction of a new chemical sludge pumping facility (Facility 30) and associated improvements to solids handling at the Bethelview Advanced Water Reclamation Facility. The buyer is the Board of Water and Sewer Commissioners of the City of Mobile (MAWSS) and the work includes building a chemical sludge pump station and related site, electrical, and solids handling improvements. The project is a construction procurement with an estimated value range of $5,000,000 - $10,000,000.
Posted Date
Jan 30, 2026
Due Date
Mar 3, 2026
Release: Jan 30, 2026
Close: Mar 3, 2026
The solicitation requests construction of a new chemical sludge pumping facility (Facility 30) and associated improvements to solids handling at the Bethelview Advanced Water Reclamation Facility. The buyer is the Board of Water and Sewer Commissioners of the City of Mobile (MAWSS) and the work includes building a chemical sludge pump station and related site, electrical, and solids handling improvements. The project is a construction procurement with an estimated value range of $5,000,000 - $10,000,000.
AvailableProject consist of replace existing mcc and lighting panelboard and refeed all existing loads from new equipment - replace electrical feeder from the existing main distribution switchboard to the new mcc. - provide new power monitoring system connected to the scada system - provide temporary standby generator to maintain plant operations at all times. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Project consist of replace existing mcc and lighting panelboard and refeed all existing loads from new equipment - replace electrical feeder from the existing main distribution switchboard to the new mcc. - provide new power monitoring system connected to the scada system - provide temporary standby generator to maintain plant operations at all times. See outside link.
AvailableSupply and deliver the designated number of upper and lower Durotex, or equal, replacement belts used for a sludge dewatering application for a Charter Machine Company Model 22.61 belt filter press.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Supply and deliver the designated number of upper and lower Durotex, or equal, replacement belts used for a sludge dewatering application for a Charter Machine Company Model 22.61 belt filter press.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →