Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The solicitation requests construction of a new chemical sludge pumping facility (Facility 30) and associated improvements to solids handling at the Bethelview Advanced Water Reclamation Facility. The buyer is the Board of Water and Sewer Commissioners of the City of Mobile (MAWSS) and the work includes building a chemical sludge pump station and related site, electrical, and solids handling improvements. The project is a construction procurement with an estimated value range of $5,000,000 - $10,000,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Cumming (Cumming Utilities Department) is soliciting Competitive Sealed Proposals for construction of a new chemical sludge pump station (Facility 30) at the Bethelview Advanced Water Reclamation Facility to improve solids handling capacity and efficiency. Bidders must attend a mandatory pre-bid conference on February 11, 2026, submit a Qualifications Statement, include bid security of at least 5% of the base bid, and provide 100% performance and payment bonds. Proposals are due March 3, 2026 by 2:00 PM local time; estimated project value is approximately $5,000,000–$15,000,000.
Posted Date
Jan 30, 2026
Due Date
Mar 3, 2026
Release: Jan 30, 2026
Close: Mar 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Cumming (Cumming Utilities Department) is soliciting Competitive Sealed Proposals for construction of a new chemical sludge pump station (Facility 30) at the Bethelview Advanced Water Reclamation Facility to improve solids handling capacity and efficiency. Bidders must attend a mandatory pre-bid conference on February 11, 2026, submit a Qualifications Statement, include bid security of at least 5% of the base bid, and provide 100% performance and payment bonds. Proposals are due March 3, 2026 by 2:00 PM local time; estimated project value is approximately $5,000,000–$15,000,000.
AvailableProject Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
Project Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.
AvailableChemical Feed Pump Parts.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Chemical Feed Pump Parts.
AvailableWork related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow