Closed

Preventative Maintenance for Dairy Analyzers (Request for Quote)

Description: Preventative maintenance for dairy analyzers. preventative maintenance for the FLM300 should include: Disassembling instrument components or panels; Inspecting internal electrical, mechanical, optical, pneumatic, and heating systems; Diagnosing instrument faults and error codes; Replacing internal parts such as sensors, boards, motors, pumps, probes, filters, lamps, tubing, seals, or wiring as needed Annual replacement of both excitation and emission filters. That is one of the clearest scheduled PM items in the FLM300 guide.; Fuse check/replacement when indicated, using the specified 5 x 20 mm, 250V, time-delay,1-Amp fuses. See outside link.

Buyer
City of El Paso

City · TX, US

Released
Aug 18, 2026
Closes
Aug 25, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts