Preventative Valve Maintenance - Project 2 RFP
Preventative maintenance described below on all water main line valves and hydrant lateral valve. The work for both project locations shall include the following: a. The water system shall remain pressurized during all preventative valve maintenance work. b. Furnishing of all labor, materials and equipment necessary to complete the preventative maintenance work. c. Individual valves are to be documented with a visual and operational inspection, d. Full replacement of all valve bonnet bolts/nuts, stuffing box bolts/nuts, operating nut hold down bolt, pressure plug and valve boxes. e. Required inclusions for this project are but not limited to the following: traffic control, saw cutting of roadway, asphalt removal and disposal, excavation, dewatering, spoils removal and disposal, valve preventative maintenance, valve documentation/inspection, resetting of new valve box, import of sand and DGA backfill, compaction and repaving/restoration of area.