Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the construction of the permanent well discharge piping, pressure filtration system, filter building, chemical feed, clearweel, finished water pump station, solids handling pond, yard piping, site improvements, electrical and instrumentation. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 1, 2025
Close: Jan 15, 2026
Project include water treatment plant.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableConstruction of three potable water supply wells (No. 7, No. 8 and No. 9) ranging in depths of 104' to 108'; a new 3.0 MGD water treatment plant (WTP) with a 3-acre solar array; and approx. 60 LF of 6" water main, 500 LF of 8" water main, 9,300 LF of 14" water main, 2,000 LF of 4" forcemain, 260 LF of dry jack and bore with 24" casing piping, and 162 LF of 4" chemical feed conduit. The WTP building is approx. 9,239 SF total and consists of 2,466 SF of office area 6,773 SF of process area housing three horizontal pressure filters, four vertical ion exchange softeners, and chlorination, phosphate and fluoride chemical feed systems, along with a solar array field consisting of 28 total arrays, each 15' x 45'.
Posted Date
Dec 15, 2025
Due Date
Feb 23, 2026
Release: Dec 15, 2025
Close: Feb 23, 2026
Construction of three potable water supply wells (No. 7, No. 8 and No. 9) ranging in depths of 104' to 108'; a new 3.0 MGD water treatment plant (WTP) with a 3-acre solar array; and approx. 60 LF of 6" water main, 500 LF of 8" water main, 9,300 LF of 14" water main, 2,000 LF of 4" forcemain, 260 LF of dry jack and bore with 24" casing piping, and 162 LF of 4" chemical feed conduit. The WTP building is approx. 9,239 SF total and consists of 2,466 SF of office area 6,773 SF of process area housing three horizontal pressure filters, four vertical ion exchange softeners, and chlorination, phosphate and fluoride chemical feed systems, along with a solar array field consisting of 28 total arrays, each 15' x 45'.
AvailableProvide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →