Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project include water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of three potable water supply wells (No. 7, No. 8 and No. 9) ranging in depths of 104' to 108'; a new 3.0 MGD water treatment plant (WTP) with a 3-acre solar array; and approx. 60 LF of 6" water main, 500 LF of 8" water main, 9,300 LF of 14" water main, 2,000 LF of 4" forcemain, 260 LF of dry jack and bore with 24" casing piping, and 162 LF of 4" chemical feed conduit. The WTP building is approx. 9,239 SF total and consists of 2,466 SF of office area 6,773 SF of process area housing three horizontal pressure filters, four vertical ion exchange softeners, and chlorination, phosphate and fluoride chemical feed systems, along with a solar array field consisting of 28 total arrays, each 15' x 45'.
Posted Date
Dec 15, 2025
Due Date
Feb 23, 2026
Release: Dec 15, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 23, 2026
Construction of three potable water supply wells (No. 7, No. 8 and No. 9) ranging in depths of 104' to 108'; a new 3.0 MGD water treatment plant (WTP) with a 3-acre solar array; and approx. 60 LF of 6" water main, 500 LF of 8" water main, 9,300 LF of 14" water main, 2,000 LF of 4" forcemain, 260 LF of dry jack and bore with 24" casing piping, and 162 LF of 4" chemical feed conduit. The WTP building is approx. 9,239 SF total and consists of 2,466 SF of office area 6,773 SF of process area housing three horizontal pressure filters, four vertical ion exchange softeners, and chlorination, phosphate and fluoride chemical feed systems, along with a solar array field consisting of 28 total arrays, each 15' x 45'.
AvailableWork includes installation of a water supply well and all associated appurtenances including all metering, valves, and piping.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Close: Feb 19, 2026
Work includes installation of a water supply well and all associated appurtenances including all metering, valves, and piping.
AvailableConstruct new water treatment plant.
Posted Date
Jan 1, 2026
Due Date
Feb 13, 2026
Release: Jan 1, 2026
Close: Feb 13, 2026
Construct new water treatment plant.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Feb 24, 2026
Release: Nov 24, 2025
Close: Feb 24, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.