Retrieving RFP details
Release
Close
College Of Charleston
Prequalification for central energy facility and piping infrastructure upgrades - phase b.
SE110-H159676JR-B
San Diego Metropolitan Transit System
Provide KMD ZEB Infrastructure Phase 1 - Prequalification of Bidders
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
City of Fort Gaines
Construction of new, mechanical wastewater treatment facility adjacent to the City's existing wastewater treatment plant and site improvements including grading, piping, and electrical improvements along with the installation of supervisory control and data acquisition (SCADA) at each of the City's existing lift stations.
Release
Oct 20, 2025
Close
Nov 10, 2025