Closing soon

Prepare-to-Deploy Orders (ptdo) Bill of Materials (bom) for the 249th En Bat RFP

Description: 15kv, 1/0 AWG AL (aluminum), 133% concentric neutral cable 1500 F. 15kv, 500 MCM CU (copper), concentric neutral cable 500 F. Cable, bare copper, stranded #2 1000 F. 200A Load Break Kits W/ Capacitive Test Point 100 EA. 200A Load break elbow adapter; 15 EA. Connector, compression, lug, 1/0, 200a, load break; 20 EA. 1/0 cold shrink splice kit; 20 EA. 1/0 Barrel Compression lug; 10/PK 2 PK. Insert, bushing, load break; 15 EA. Probe, contact, load break; 20 EA. 500 MCM Cold Shrink Splice Kit (Copper Conductor); 3 EA. 500 MCM Barrel Compression Lug (Copper or Al Conductor); 3/PK 3 PK. Elbow, Insulating, 15kv, Dead Break Kit; 15 EA. Connector, compression, lug, 500mcm, 600a, dead break; 15 EA. 600 A Dead break Cold Shrink; 15 EA. 5/8" Ground Rods 10'; 50 EA. CONNECTOR, SPLIT BOLT, 1/0-350KCMIL; 50 EA. CONNECTOR, SPLIT BOLT, 6 AWG - 2 AWG; 100 EA. 2228 3M Mastic tape 10 F roll by 1 inch wide; 25 RO.

Released
Aug 17, 2026
Closes
Aug 27, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts