Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include develop a guide and field decision support tool to evaluate post-wildfire impacts on affected slopes and slope protection and stabilization systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Dec 31, 2025
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
AvailableDevelop a community wildfire protection plan.
Posted Date
Dec 10, 2025
Due Date
Jan 10, 2026
Release: Dec 10, 2025
Close: Jan 10, 2026
Develop a community wildfire protection plan.
AvailableDevelop a comprehensive and California-aligned Community Wildfire Protection Plan (CWPP) to strengthen community resilience to wildfire, support hazard mitigation planning, guide fuel-reduction priorities, and improve coordination with regional, state, and federal partners. Recent fire events, including the Eaton Fire (2025), have highlighted the need for a modernized community wildfire strategy that addresses local fuel loads, evacuation constraints, WUI exposures, and climate-driven fire behavior. The project’s purpose is to reduce wildfire risk, improve operational readiness, enhance public safety, and ensure Sierra Madre is well positioned for state and federal funding opportunities related to wildfire mitigation.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Develop a comprehensive and California-aligned Community Wildfire Protection Plan (CWPP) to strengthen community resilience to wildfire, support hazard mitigation planning, guide fuel-reduction priorities, and improve coordination with regional, state, and federal partners. Recent fire events, including the Eaton Fire (2025), have highlighted the need for a modernized community wildfire strategy that addresses local fuel loads, evacuation constraints, WUI exposures, and climate-driven fire behavior. The project’s purpose is to reduce wildfire risk, improve operational readiness, enhance public safety, and ensure Sierra Madre is well positioned for state and federal funding opportunities related to wildfire mitigation.
AvailableProvide community wildfire protection plan.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Provide community wildfire protection plan.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis