Retrieving RFP details
Release
Close
City of Port Orange
Restoration of the existing shooting range berms. This project is to restore the front slope of the berm to ensure long-term stability, erosion control, and continued safe operation of the range.
City of Reno
Work includes removal of existing sidewalk, construction of approximately 1,750' of 10' sidewalk, new ada ramps, landscaping and irrigation replacement, riverbank erosion protection, and protection, relocation, and adjustment of existing streetlights, monuments, benches, and trash cans.
City of Chattanooga
Work includes installation of covered shooting area roof.
Indiana Department of Natural Resources
Concessions opportunity.
Release
Oct 03, 2025
Close
Nov 03, 2025