Omaha Metropolitan Utilities District
Special DistrictNE
Posted
Oct 9, 2026
Dec 3, 2026
LNG Storage Building Storm Shelter and Bathroom Remodel RFP
LNG Storage Building Storm Shelter and Bathroom Remodel
Description: Demolition of the current southern bathroom wall to open into storage room space. Erection of wall to enclose bathroom on the west side to re-enclose space. Adding of waterproofing sidings to all bathroom walls. Remove of old laminate flooring and installation of new laminate flooring. Installation of new toilet and sink. Installation of wall outlets. Installation of ventilation and motor. Installation of ADA fixtures to bring bathroom up to ADA compliance. South bathroom-new we are planning an addition of another ADA bathroom adjacent to the updated southern bathroom. Removal of shelf from storage room. Erection of wall on west end of bathroom to enclose from storage room. Cutting door frame on north wall and installing ADA compliant door. Installation of wall outlets, light fixture and light switch. Installation of ventilation and motor. Installation of new toilet and sink. Adding of waterproofing sidings to all bathroom walls. Installation of ADA fixtures to bring bathroom up to ADA compliance. North utilities room update. Replace current sink with free standing utilities sink with goose neck faucet. Removal of toilet and capping.
SpecialDistrict · MN, US
Adjacent opportunities open for bidding right now.
Omaha Metropolitan Utilities District
Special DistrictNE
Posted
Oct 9, 2026
Dec 3, 2026
LNG Storage Building Storm Shelter and Bathroom Remodel
CityPA
Posted
Oct 19, 2026
Nov 20, 2026
Sealed Bids for the construction of the Montgomery Park ADA Bathroom - Interior Improvement Project will be received electronically via PennBid (https://pennbid.bonfirehub.com) by Montgomery Borough until 11:00 A.M. local time on Friday November 20th, 2026, at which time they will be unsealed, with bid results posted publicly on PennBid via a Public Notice shortly thereafter. Bidding and Contract Documents may be viewed and downloaded online at no cost on PennBid (https://pennbid.bonfirehub.com). Following registration, complete sets of Bidding & Contract Documents may be downloaded from the website as portable document format (PDF) files. The cost of printing Bidding and Contract Documents will be the sole responsibility of the interested party. For questions pertaining to access and use of the website, contact PennBid at 610-693-4769, or by email at info@pennbid.net. A Pre-Bid Conference will be held at 10:00 AM local time on November 5th, 2026 at the Montgomery Borough Office, located at 35 S. Main Street, Montgomery, PA 17752. Attendance at the Pre-Bid Conference is highly encouraged but is not mandatory. Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him. The Contractor shall ensure that employees and applicants for employment are not discriminated against because of race, age, color, religion, sex, national origin or handicap status; and comply with the Nondiscrimination/Sexual Harassment Clause included in the Supplementary Conditions, the Americans with Disabilities Act, the Pennsylvania Human Relations Act, federal and Pennsylvania laws and regulations, relating to non-discrimination and sexual harassment, drug-free workplaces and disadvantage business enterprises. Montgomery Borough reserves the right to waive any irregularities and to reject any and all bids and to award the contract to the lowest responsible bidder for the total of all bid items. No bidder may withdraw his or her bid within ninety (90) days after the actual opening thereof. Montgomery Borough is an Equal Opportunity Employer.
CityNY
Posted
Oct 5, 2026
Nov 12, 2026
Renovation of the Town Hall east wing, including ADA holding cells and a bathroom.
Loxahatchee River Environmental Control District
Special DistrictFL
Posted
Oct 4, 2026
Nov 3, 2026
Work consists of interior and exterior renovation of the existing single-story IT offices building, including site utility and fiber-optic conduit work, selective demolition, concrete and exterior repairs,electrical/plumbing/low-voltage rough-in, cabinetry and millwork, plumbing fixtures, electrical and lighting finishes, structured cabling and fiber systems, and a new building security and access-control system.
Decision makers connected to this RFP from Plum Creek Library System.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
253 days before RFP
The Governing Board set aside $5,000 for Phase #1 of the bathroom remodel.
19. FY26 BUDGET SURPLUS USES M/S B. Paplow/D. Roskamp to set aside $5,000.00 for Phase #1 of the bathroom remodel, and fund a Strategic Planning course through Library Strategies for $5,000.00. Roll call taken and motion carried.
Plum Creek Library System Governing Board Governing Board Minutes
Board meeting · Feb 11, 2026
Board meeting
218 days before RFP
The draft FY27 capital outlay budget included an estimated $35,000 for an ADA restroom remodel.
11. FY27 Draft Budget 11.1. Draft Operational Budget: Presented with three COLA options: 2.5%, 2.8%, and 3%. Recommendation to move legacy coordinator wages to the general budget. 11.2. Draft Capital Outlay Budget: Includes ADA restroom remodel estimated at $35,000.
Plum Creek Library System Executive Committee Minutes
Board meeting · Mar 18, 2026
Board meeting
127 days before RFP
The Governing Board postponed the bathroom-remodel project until fall and directed that it be rebid.
10. Bathroom Remodel and Bid Evaluation The Board reviewed plans to remodel the restroom area to improve accessibility and functionality. Discussion included project scope, bid pricing, and the limited number of bids received. Thomas Andries moved to postpone the project until fall and rebid the project at that time. Bob Paplow seconded the motion. Andries…
Plum Creek Library System Governing Board Governing Board Meeting Minutes
Board meeting · Jun 17, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (43 days left)