Closed

PLA Survey regarding the potential use of a PLA for the DFC Flatwork Design-Build Project

Description: DESIGN BUILD: The infrastructure items in this project may include but are not limited to the following: Full campus design of electric vehicle (EV) charging infrastructure. Installation of 20-40 electric vehicle charging stations. Replacement or repair of 3 vehicle bridges and a pedestrian bridge. 2 box culvert repairs. Replacement of an undetermined length of 6” domestic water piping. Campus-wide vehicle roadway paving. Replacement of the campus perimeter security fence. Repaving of as many as 40 parking lots on the campus totaling 2.7 to 3 million square feet (SF), which will include the installation of conduit for electric vehicle charging infrastructure and the redesign and upgrade of connected ramps and pathways to meet ABAAS and P100 compliance.

Buyer
PBS R8

Federal · CO, US

Released
Oct 1, 2024
Closes
Oct 21, 2024(Closed)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts