General Services Administration - Public Buildings Service, PBS R8 Acquisition Management Division
DESIGN BUILD: The infrastructure items in this project may include but are not limited to the following: Full campus design of electric vehicle (EV) charging infrastructure. Installation of 20-40 electric vehicle charging stations. Replacement or repair of 3 vehicle bridges and a pedestrian bridge. 2 box culvert repairs. Replacement of an undetermined length of 6” domestic water piping. Campus-wide vehicle roadway paving. Replacement of the campus perimeter security fence. Repaving of as many as 40 parking lots on the campus totaling 2.7 to 3 million square feet (SF), which will include the installation of conduit for electric vehicle charging infrastructure and the redesign and upgrade of connected ramps and pathways to meet ABAAS and P100 compliance.
Release
Oct 01, 2024
Close
Oct 21, 2024