CityTN
Posted
Aug 21, 2026
Sep 17, 2026
GPAC Lighting Console Replacement
Procurement and installation of an etc apex 10 24k control console (or equal) and the professional installation and commissioning of user-provided response mk2 gateways (replacing existing legacy net3 nodes); removal of legacy console and nodes (remain property of the city of germantown), and the installation of the new etc apex 10 console and user-provided response mk2 gateways (seven 1-port and two 4-port) utilizing existing cabling. This phase includes implementing the new ip scheme for all lighting equipment (console, nodes, x4-etc cem3 power control processors, paradigm architectural control processors, and unison paradigm 18 touchscreen control station units).