CityAR
Posted
Sep 13, 2026
Sep 28, 2026
Rabbit Foot Trail, Phase II RFP
Construction of approximately 2,130 linear feet of concrete bike/pedestrian trail and tie-ins to existing driveway and sidewalk.
Description: Renovation of existing hardscape and landscape along State Street from South Temple to the Capital and adjacent Travel Council Building site and Parking lot.
Other · UT, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityAR
Posted
Sep 13, 2026
Sep 28, 2026
Construction of approximately 2,130 linear feet of concrete bike/pedestrian trail and tie-ins to existing driveway and sidewalk.
CityMO
Posted
Sep 2, 2026
Oct 1, 2026
The City of Neosho is soliciting bids for Phase 4 of the Morse Park Trail Lighting project, extending lighting from E. Spring Street to the Lampo Building. The project is part of a multi-year effort to replace existing solar lighting with a more cost-efficient and reliable electrical system. The solicitation is open, was published on September 2, 2026, and closes October 1, 2026, at 2:00 PM local time.
CityPA
Posted
Aug 21, 2026
Sep 28, 2026
Construct a shared use path.
Higher EducationMS
Posted
-
Sep 30, 2026
The engineering, furnishing, delivery, and onsite installation of a ground-supported structural truss system supporting the BGAD Phase 1 motion-capture and precipitation-test systems. The requested scope is a complete installed structural truss system suitable for subsequent mounting and integration of customer-furnished motion-capture cameras and precipitation-test equipment.